JigZaw results from system test
The following information should be persisted for each system test:
- Timestamp start of test
-
Timestamp end of test
-
Metrics from the test
- quantitative
-
Which applications?
-
For each application
- what version?
- what configuration?
- which data?
-
Base system
- Hardware description for each node
- Software description (jdk version, encoding, 32/64 bit, architecture)
These data can then be used as basis for automatic generation of
- reports
- graphs (e.g. see how the performance changes over time)
- BI