Skip to content

JigZaw results from system test

The following information should be persisted for each system test:

  • Timestamp start of test
  • Timestamp end of test

  • Metrics from the test

    • quantitative
  • Which applications?

  • For each application

    • what version?
    • what configuration?
    • which data?
  • Base system

    • Hardware description for each node
    • Software description (jdk version, encoding, 32/64 bit, architecture)

These data can then be used as basis for automatic generation of

  • reports
  • graphs (e.g. see how the performance changes over time)
  • BI